Step 23 of 36 · Delivery
De-risking early
Do the scariest part first. A project that leaves its hardest unknown to the end has scheduled its own surprise.
Large projects seldom fail on the parts everyone understood. They fail on the unknown that was left for later: the integration nobody tried, the load nobody measured, the team that never agreed.
List the assumptions the plan depends on. Rank them by how wrong they could be and what that would cost. Attack the top ones first with the cheapest test that gives a real answer: a thin slice that runs through every system, a prototype against production-like data, a direct conversation with the team you depend on.
Resist the pull to begin with the well-understood work because it shows progress. Early progress on easy parts is comfort, not information. Decide in advance what result would make you change the plan or stop.
Try this week
- Write the five assumptions your current project depends on and the cheapest test for each.
- Plan a thin slice that passes through every system involved, and get it running before any component is finished.
Signs you've got it
- Your project plans put the highest-risk work at the start.
- You have changed or stopped a project because an early test failed, and said so openly.
Resources
- bookRisks and Rabbit Holes (Shape Up, chapter 5) (opens in a new tab)Ryan Singer
- articleSteel threads are a technique that will make you a better engineer (opens in a new tab)Jade Rubick
- articlePerforming a Project Premortem (opens in a new tab)Gary Klein
- guideWorking in small batches (opens in a new tab)DORA
- bookThe Pragmatic Programmer, 20th Anniversary Edition (opens in a new tab)David Thomas and Andrew Hunt