Leading industrial automation teams
Your software runs someone else's plant. Their uptime and their people's safety are the product, equipment stays in service for decades and the work is finished on site with operators and integrators, not at your desk. Change is slow here for reasons worth learning before you challenge them.
See the 24 roadmap steps this changes ↓What is different here
- 01
The plant's uptime is the customer's business
When your system stops, a production line stops, and the cost lands on the customer by the hour. They did not buy software. They bought output. That is why changes wait for planned shutdowns, why a version that works stays for years and why your release calendar is really theirs.
Lead accordingly. Learn each major customer's maintenance windows and plan releases around them. Make every change reversible on site by the customer's own staff. Treat a request to patch a running plant as a risk decision for the plant manager, made with your facts, not one your team takes alone. Judge yourself on the stopped hours you caused, not on features shipped.
- 02
Safety comes first and has its own rules
Machines and processes can injure and kill. The functions that prevent this are engineered apart from normal control, under standards that prescribe the method, the evidence and the independence of the people who check it. A clever change that touches a safety function outside that process is a serious breach, however good the code.
Know where the safety boundary runs in every product and project, and who is competent to work inside it. Give anyone on site the authority to stop work. Learn the site rules before your people travel: permits, isolation of energy, protective equipment. Plant staff will judge your engineers by whether they follow them.
- bookOut of control: Why control systems go wrong and how to prevent failure (HSG238) (opens in a new tab)Health and Safety Executive
- guideIEC 61511-1:2016 Functional safety: Safety instrumented systems for the process industry sector, Part 1 (opens in a new tab)International Electrotechnical Commission
- guideControl of Hazardous Energy (Lockout/Tagout) (opens in a new tab)Occupational Safety and Health Administration
- 03
IT habits meet operational technology culture
Software people arrive with habits that are virtues elsewhere: patch quickly, update often, connect everything. Plant engineers hear a threat to a process that has run safely for years. Their caution is earned. In operations, safety and availability outrank confidentiality and novelty, and a reboot is an event with a cost.
You will not win this argument with speed. Send your engineers to the plant floor to watch a shift. Hire or promote people who have commissioned real equipment, and give them a voice in design. Bring security in the plant's own terms: zones, patches tested first and applied at a planned stop, and remote access the site can see and switch off.
- guidePrinciples of Operational Technology Cyber Security (opens in a new tab)Australian Signals Directorate, CISA and partner agencies
- guideISA/IEC 62443 Series of Standards (opens in a new tab)International Society of Automation
- guideOperational Technology (opens in a new tab)National Cyber Security Centre
- 04
Equipment lives for decades
A controller installed this year may still run when your current team has retired. Customers expect spare parts, compatible replacements and support for versions you would prefer to forget. The installed base is your largest asset and your heaviest obligation.
This shapes the technology and the people. Backward compatibility is a promise, so each new interface is a long commitment. Standard languages and protocols matter because the customer's technicians must maintain the system without you. Keep people who know the old generations, write down what they know and announce end-of-support dates years ahead. A team that wants a rewrite must first say who supports the old system meanwhile.
- guideIEC 62402:2019 Obsolescence management (opens in a new tab)International Electrotechnical Commission
- guideIEC 61131-3:2013 Programmable controllers, Part 3: Programming languages (opens in a new tab)International Electrotechnical Commission
- guideOPC Unified Architecture (opens in a new tab)OPC Foundation
- 05
Done is decided on site
A project is not finished when the code is merged, or even when it passes the factory acceptance test. It is finished when the system runs the real process on the customer's site, with their wiring, their network and their materials, and the customer signs. Commissioning finds what no office test can.
Plan it as real engineering time: travel, long days, night work during a shutdown. Stop it falling on the same few people every time, and count site experience towards promotion. Invest in simulation and a thorough factory test to shorten the site phase, and feed every commissioning finding back into design. If developers never visit a site, the same faults keep arriving.
- guideIEC 62381:2024 Automation systems in the process industry: Factory acceptance test, site acceptance test and site integration test (opens in a new tab)International Electrotechnical Commission
- bookLessons In Industrial Instrumentation (opens in a new tab)Tony R. Kuphaldt
- guideNASA Systems Engineering Handbook: 5.5 Product Transition (opens in a new tab)NASA
- 06
Operators and integrators are your real users
The person who lives with your system is an operator on a night shift, not the buyer who signed. If screens confuse or alarms arrive in floods, operators learn to ignore or bypass them, and the plant becomes less safe. Between you and that operator there is often an integrator who configures, installs and supports your product, with their own engineers and their own shortcuts.
Design and test with operators and maintenance technicians, not only with the customer's project engineers. Treat alarm load and screen clarity as quality measures. Train integrators, write for them and listen to them. They see more sites than you do, and they decide whether your product gets recommended.
- guideAlarm management (opens in a new tab)Health and Safety Executive
- guideISA-101 Series of Standards: Human Machine Interfaces for Process Automation Systems (opens in a new tab)International Society of Automation
- guideISA-18 Series of Standards: Management of Alarm Systems for the Process Industries (opens in a new tab)International Society of Automation
On the roadmaps
These steps change when the team works in industrial automation. Set it as your field and every roadmap highlights them.
Senior Engineer to Engineering Manager
open with this as your field →- Planning and estimates
Dates hang on the customer's shutdown window and on site readiness. Miss the window and the next may be months away, so put your buffer before it.
- Incidents and blameless reviews
Review with plant staff in the room and separate what your system did from what the process did. Where someone was hurt or nearly hurt, a formal investigation with legal duties comes before your review.
- Hiring
Hire some people who have stood in front of a machine that would not start. Controls and commissioning experience is hard to teach from an office.
- Sponsorship and career growth
Site work builds your best engineers and wears them out. Rotate it, pay for it and count commissioning as promotion evidence equal to design work.
- Delivery metrics
Deployment frequency says little when customers install once a year. Track commissioning duration, site findings per project and customer stop time your system caused.
Engineer to Tech Lead
open with this as your field →- Owning releases
A release is installed by the customer or an integrator during a planned stop, perhaps once a year. Make each one complete, documented and reversible by site staff without your help.
- Choosing technology conservatively
Conservatism is a customer requirement. Plant technicians maintain the system for decades, so standard control languages and protocols beat an elegant stack nobody on site can read.
- Quality and testing strategy
Add a simulation of the process and a factory acceptance test with the customer present. List openly what cannot be tested before site as commissioning risk.
- On-call and incidents
A call means a line is down and someone may have to travel. Agree response times by contract, use remote access the site controls and never change a running plant without the site's permission.
- Working with product and design
The user is the operator and the maintenance technician. Get your engineers into a control room for a full shift before they design a screen or add an alarm.
Hardware and Embedded Engineering Manager
open with this as your field →- Functional safety for leaders
In a plant the safety system is usually separate equipment under process-sector standards, owned by the customer's safety engineer. Agree in writing which functions are safety-rated and keep routine control changes out of them.
- Verification versus validation
Validation happens at site acceptance, on the real process. Bring the customer's operators to the factory test so validation starts before the equipment ships.
- Supporting products for years
Support runs for decades and customers expect drop-in replacements. Plan migration between product generations so a plant can upgrade one machine at a time during a stop.
- Contractors and design partners
System integrators deliver much of your product's final behaviour on site. Train and certify them, and collect their site findings as you would your own.
Security Engineering Leader
open with this as your field →- Risk is your unit of work
In a plant the top scenarios are loss of safety and loss of production, ahead of loss of data. Rank them together with the site's process safety and operations people.
- Vulnerability management and prioritisation
A patch waits for a planned stop and a test on a matching system. Agree the compensating controls, such as network segmentation, that cover the months in between.
- Third-party and supply-chain risk
Equipment vendors and integrators hold remote access into the plant, and you may be one of them. List every such path and make each one visible to the site and switchable by it.
Reliability and SRE Leader
open with this as your field →- Reliability as a feature with a cost
The price is the customer's lost production per hour, often written into the contract as penalties. Learn that figure for each major customer before you argue any trade-off.
- Change management and safe deploys
Change control belongs to the plant, through its management of change procedure. Your rollout plan is an input to their approval, including how site staff return to the old version.
- Disaster recovery and testing it
Recovery here is a technician restoring a controller from a backup at night. Check that each site holds current backups of program and configuration and has practised a restore.
AI and Physical AI Team Leader
open with this as your field →- Collecting data on real hardware
Plant data belongs to the customer and sits behind their network boundary. Access is a contract and security negotiation that can take months, so start it before the modelling.
- Deciding what not to automate
Operators hold knowledge of the process that no dataset contains. Leave them in control of anything that can stop the line or affect safety, and present model output as advice with its reasons.
Director to VP of Engineering
open with this as your field →- Customers and escalations
An escalation here is a stopped plant with a cost per hour and sometimes a safety report. Send someone who can decide to the site, and stay engaged until production restarts.
Startup CTO
open with this as your field →- Shipping every week
Weekly shipping to a running plant is not on offer. Ship weekly to your own simulation and test rig, and batch customer releases to their maintenance windows.